05/01/16 ~ Control Panel Main: installing toggle- & push switches for
turnouts ~ in progress…

05/14/16 ~ Replacing Cable004 with a LONGER four-conductor cable.

05/21/16 ~ Ground Support Brackets at CB008.

06/12/16 ~ All Turnouts are Connected AND Operational.

06/16/16 ~ Using Elmer's Glue-All Multi-Purpose Glue, fasten the three
Double-Track Truss Bridge Piers and Abutments.
06/17/16 ~ Replace 7ea. Sheet Metal Screws with Sunken Wood Screws so the
heads will not show in the water under the bridge.

07/01/19 ~ Power Plant: Removable Front Panel.

07/03/16 ~ Transformer Ebis installed onto the Power Plant with bottom
bracket.
Transformer BA = Bachmann: Transformer Hobby placed on top of TeleVideo
Systems.

07/04/16 ~ Control Panel ~ Transformer Ebis: Pre-paint sizing up against
Transformer Ebis.
07/09/16 ~ Control Panel ~ Transformer Ebis with Blok011 ~ Boost Switches
and Indicator.

07/10/16 ~ Power Plant: Removable Front Panel, Wing Screw ¼ inch - 20 x ¾
inch installed.

07/11/16 ~ Removable Front Panel, installing the Coca Cola Handle. ~
07/11/16 ~ CB012 relocated to Underground A06.

07/12/16 ~ CB021 with K006 & K007. ~ 07/18/16 ~ CB021 & CB022 (Blok011
Booster) installed.

08/20/16 ~ DB BR 89 & Brown Consist & Cleaner.

08/29/2016 ~ Bronco Drive-In Amphitheater preliminary components.
09/10/2016 ~ Cut out DVM Tray, Plywood ~ Underlayment Moisture Resistant
5.0mm.

09/14/16 ~ Water 01: filling in Stud Ultrasteel 03&04 with Pine Latt ¼ inch
x 1-½ inch x ±4 feet.

09/16/16 ~ DVM Tray Assembly.

09/18/16 ~ Water 01: clamping of the Pine Latt to allow curing of the TEC
Skill Set: 1 Indoor / Outdoor Carpet Adhesive.

09/22/16 ~ Left and right sidepanels for the DVM Tray, painted and drying.
09/23/16 ~ DVM Tray located on top of Power Plant.

09/23/16 ~ Placement of the DVM001~007 in the DVM Tray & installation of
E-Stop.

10/02/16 ~ Diorama: Temporary placement of the pine trees.

10/04/16 ~ Assembly Cable014 ~ Cable017 ~ Connecting Cable014 ~> Cable017 to
DVM003 ~> DVM006.

10/06/16 ~ All DVMs connected. /// 10/07/16 ~ Cutting supports for
Double-Track Truss Bridge Abutment Wings.

10/07/16 ~ Installing Double-Track Truss Bridge Abutment Wing, Front-Left
and support.

10/07/16 ~ Installing Double-Track Truss Bridge Abutment Wing, Front-Right
and support.

10/07/16 ~ Installing Double-Track Truss Bridge Abutment Wings,
Rear-Left-&-Right and supports.

10/26/16 ~ Cutting two 50 mm pieces to connect front- and bottom panels. ///
Cutting the front- and bottom panels.
Cutting the speaker holes in the front panel. /// Cutting the screen hole in
the front panel.

10/26/16 ~ Assembling the front- and bottom panels using the 50 mm wood
blocks.
Installing two HP LCD Speakers using Scotch: Hook & Loop Fasteners onto the
50 mm wood blocks.
Installing cable retainer 150 mm wood block behind the speakers.

10/27/16 ~ Installing the 12 VDC-Triple-Tap / Power Switch, Double USB &
BS038.
Installing the SAMSUNG Galaxy Note II & the Solaray Power Adapter ~ Input 12
VDC.
10/28/16 ~ Labeling of BS038 and indicating the polarization. /// Installing
Waxman: Grippers [SuperSliders] 1½ inch = 38 mm under bottom panel.

10/28/16 ~ Installing Waxman: Grippers [SuperSliders] 1½ inch = 38 mm under
bottom panel. /// The Bronco Drive-In Amphitheater is operational.
10/30/16 ~ Adding the Verizon-Power-Button access hole.

10/31/16 ~ The Bronco Drive-In Amphitheater is operational. /// 11/08/16 ~
M-track, K-track & C-track.

11/07/16 ~ Laying out C-track onto Power Plant for Digital Locomotive
Programming and Testing.

11/11/16 ~ Power Plant, Digital Programming Track installed.

11/12/16 ~ Tunnel portal Blok003&Blok008 & Tunnel portal Blok004&Blok010.

11/15/16 ~ Changing the address on the Hogwarts Express, due to conflict
with the BR 74.

11/16/16 ~ Busch Tunnel Portals [HO 7027]: Choosing paints for the Portals.
11/18/16 ~ Lisa painted with Testors 1163: Gray Flat & Testors 1185:
Rust.

11/11/16 & 11/20/16 ~ Hogwarts Express: Replacing anti-slip tires.

12/18/16 ~ Kibri 9760 Roman style church in Jakobwullesheim & Woodland
Scenics S131 Maple Leaf Cemetery.

12/20/16 ~ Power Plant, Digital Programming Track: installing safety bar
under the DVM Tray. /// 12/22/16 ~ Windmill "The Cat" with motor.

12/22/16 ~ Windmill "The Cat" with motor: removing the inventory from the
box.

12/22/16 ~ Windmill "The Cat" with motor: removing the inventory from the
box.

12/25/16 ~ Installation of a 2291 M~>K adaptor in Dx-Port Out with Isolatie
Blok002-Dx-Port Out.
12/28/16 ~ Windmill "The Cat" with motor: Building floor and Boardwalks.

12/29/16 ~ Windmill "The Cat" with motor: Re-enforcements cut from leftovers
of the Double-Track Truss Bridge.

12/29/16 ~ Probable location of the Windmill "The Cat" with motor in Water
01.
12/30/16 ~ Windmill "The Cat" with motor: Building wall cut outs.

12/30/16 ~ Windmill "The Cat" with motor: [A4/1] Front wall 'Before &
After'.

12/31/16 ~ Windmill "The Cat" with motor: [A4/1] Back wall 'Before'. ///
01/02/17 ~ 'After'.

01/02/17 ~ Windmill "The Cat" with motor: [A4/3] Sidewall waterfront and
[A4/4] Sidewall with door 'Before'. /// 01/04/17 ~ 'After'.

01/04/17 ~ Windmill "The Cat" with motor: Four walls and Building floor
'Before'.
01/05/17 ~ Windmill "The Cat" with motor: Building floor and Boardwalks with
Front- Back- and both Sidewalls.

01/05/17 ~ Windmill "The Cat" with motor: so far in Water 01.
01/06/17 ~ Windmill "The Cat" with motor: Black-out masking paper
installation.

01/08/17 ~ Windmill "The Cat" with motor: Elements for the roof.
01/08/17 ~ Windmill "The Cat" with motor: Assembling and fitting the roof
onto the building.