Euro T&F 004      

Tuesday February 19, 2019

Home
About Me
Interests
Favorites
Euro T&F Links
Euro T&F 001
Bronco Drive-In Amphitheater
Photo Gallery 001
Photo Gallery 002
Feedback

~ Euro Travel & Freight ~ ~

If you would like a high quality resolution picture, e-mail me at evandendijck@elp.rr.com (refer to the BrainBox.xls for file size).

New Items on: Bottom of Page = New Items

To: Euro T&F Links ~~~>   To: Euro T&F 003 ~~~>   This page is Euro T&F 004   To: Euro T&F 005~~~>

01/17/16 ~ Switch Select 001 Bottom View with LED Red 009 & R0083 + LED Yellow 005 & R0084 + LED Blue 001 & R0085.

Switch Select 001 Top View with LED Red 009.

01/17/16 ~ Switch Select 001 Top View with LED Yellow 005 + LED Blue 001.

01/18/16 ~ 6 Ground Connection Cable Supports.

02/02/16 ~ Blok-Group007-Part 1 = Blok018 & Blok019 & Blok020 & Blok021.

02/12/16 ~ Power Plant: Disassembly 1980's model and 2016 configuration lay-out.

02/13/16 ~ Drill feed-through for Transformer wiring using vintage tools.

02/14/16 ~ AC-Outlet 006 & BS031.

02/14/16 ~ Transformer A.

02/15/16 ~ Transformer A - B - C - D - E. /// 02/17/16 ~ Phasing Transformers A - B - C with Tektronix TDS 320 Two Channel Oscilloscope.

02/17/16 ~ Phasing Transformers A - B - C with Tektronix TDS 320 Two Channel Oscilloscope.

02/17/16 ~ AC-connection Transformer D + Power Plant AC/DC Ground Integration [pencil].

02/17/16 ~ Transformer D is 180° out-of-phase with respect to Transformer A.

02/17/16 ~ Transformer D is IN-phase with respect to Transformer A.

02/17/16 ~ Transformer A - B - C - D - E: Variable AC-output connections.

02/18/16 ~ Hinge Continuous 1-1/16 in x 48 in ~ Bright Brass Finish. /// 02/24/16 ~ Cut a Shelf 11.8"D x 47.8"W ~ Beachwood in half to construct the side walls.

02/24/16 ~ Cut a Shelf 11.8"D x 47.8"W ~ Beachwood in half to construct the side walls.

02/24/16 ~ Install the Hinge Continuous 1-1/16 in x 48 in ~ Bright Brass Finish onto the Empire Lumber Company: Strip 1x2-8FT WW/WF.

02/27/16 ~ Strip 1x2-8FT WW/WF @ 1182 mm installed on Shelf 11.8"D x 47.8"W ~ Beachwood.

02/27/16 ~ Hinge Continuous 1-1/16 in x 48 in ~ Bright Brass Finish Assembly.

02/28/16 ~ Hinge Continuous 1-1/16 in x 48 in ~ Bright Brass Finish Assembly installed in the Power Plant.

02/28/16 ~ Installing front frame.

02/28/16 ~ Installing the back panel.

02/29/16 ~ Installing six Caster, Swivel, 3" Clear Polyurethane, 200 lb. Capacity.

02/29/16 ~ Installing Power Plant Top Panel together with Hinge Continuous onto the Power Plant.

03/05/16 ~ Installing left&right-top frame.

03/05/16 ~ Installing Lid Support Hinge Left & Right ~ Bright Brass Finish.

03/06/16 ~ Installing left & right inside panel.

03/06/16 ~ Cutting of the upper-left feed-through hole with a hole-saw.

03/07/16 ~ Installing Emergency-Stop AC-Input Assembly.

03/07/16 ~ Installing & Testing Phase & Ground of AC-Outlet 007 & Switch Select 003 in Conventional & Digital.

03/13/16 ~ Installing AC-Outlet 008 = 220 VAC European. /// Installing Xfmr 009.

03/14/16 ~ Disassembly of Transformer E.

03/14/16 ~ Installing & Transformer E is IN-phase with respect to Transformer A.

03/14/16 ~ Installing & Transformer E is IN-phase with respect to Transformer A.

03/20/16 ~ AC-Outlet 009 = DC Power.

03/23/16 ~ Installing TeleVideo Systems onto Shelves in the Power Plant. /// LEDs on Control Panel Main = ON & Transformer B Indicator = ON.

03/27/16 ~ AC-Outlet 010 = Main Power. /// 04/05/16 ~ Installation of Xfmr 010 in the bottom of Power Plant.

03/29/16 ~ CB020 ~ Current Monitor Enable. /// 04/04/16 ~ CB020 installed in Power Plant.

04/07-16 ~ Installing BS036 ~ +12 VDC Access Point.

04/07/16 ~ Transformer AA installed on ¼ Shelf. /// 04/15/16 ~ Xfmr 014, 2nd Secudairy feeding 2* Red + Yellow Lamps: nice soft light.

04/13/16 ~ Initial Xfmr 014 Output measurement setup. /// 04/15/16 ~ Xfmr 014 is IN-Phase with Transformer A.

04/18/16 ~ Installing CF004 onto Cable011.

04/20/16 ~ CB020 with current-clip-on-loops installed.

04/20/16 ~ CB020 with current-clip-on-loops installed. /// 04/21/16 ~ CB020 connected to Cable011 and BS031.

04/20/16 ~ The 'New' CB019 after replacing a broken Component Board, Prepunched Perfboard. /// 04/21/19 ~ A bracket for CM004.

04/21/19 ~ Installing CM004 on it's bracket.

04/21/16 ~ Busch Tunnel Portals [HO 7027] & Artitec ~ Rowing Boats 50.122.

04/21/16 ~ Faller Chapel with Wayside Crosses 130235 & Faller Brewery 130960.

04/21/16 ~ Busch UFO Space Craft [1010].

04/25/16 ~ All twelve Conventional Trains on Levelground.

04/25/16 ~ All twelve Conventional Trains on Levelground.

To: Euro T&F Links ~~~>   To: Euro T&F 003 ~~~>   This page is Euro T&F 004   To: Euro T&F 005~~~>

 

 

Home • About Me • Interests • Favorites • Euro T&F Links • Euro T&F 001 • Bronco Drive-In Amphitheater • Photo Gallery 001 • Photo Gallery 002 • Feedback

This site was last updated 02/19/19