Euro Travel & Freight ~
~ 

If you would like a high quality resolution picture, e-mail me at
evandendijck@elp.rr.com (refer to the BrainBox.xls
for file size).
New Items on: Bottom of Page = New Items
To: Euro
T&F Links ~~~>
To: Euro T&F 006 ~~~>
This page is Euro T&F 007
To: Euro T&F 008 ~~~>

11/24/17 ~ Sanatorium, Casino, Kurhaus, Vollmer.

11/24/17 ~ Sanatorium, Casino, Kurhaus, Vollmer: sprues.

11/24/17 ~ Sanatorium, Casino, Kurhaus, Vollmer: sprues.

11/24/17 ~ Sanatorium, Casino, Kurhaus, Vollmer: sprues.

11/24/17 ~ Sanatorium, Casino, Kurhaus, Vollmer: sprues.

11/24/17 ~ Sanatorium, Casino, Kurhaus, Vollmer: sprues.

11/26/17 ~ Verdeelplaat 03 & 04 on Plank 29

11/27/17 ~ CB024 = Power Supply, LED /// 11/29/17 ~ Install CB024 on
Plank 29.

12/09/17 & 12/10/17 ~ Sanatorium, Casino, Kurhaus, Vollmer: pre-fab
walls.

12/10/17 ~ Vollmer 3776 Kurhaus - Sanatorium: 3 Floor levels complete.
/// 12/11/1 ~ Vollmer 3776 Kurhaus - Sanatorium: Joining the 3 buildings.

12/11/17 & 12/13/17 & 12/14/17 ~ Sanatorium, Casino, Kurhaus, Vollmer:
pre-fab walls.

12/16/17 & 12/18/17 & 12/19/17 ~ Sanatorium, Casino, Kurhaus, Vollmer:
roof top attributes.

12/21/17 ~ Vollmer 3776 Kurhaus - Sanatorium: Upper floor walls & Roofs
complete.
12/23/17 ~ Vollmer 3776 Kurhaus - Sanatorium: Upper floor walls
installation.

12/24/17 ~ Vollmer 3776 Kurhaus - Sanatorium: Upper floor last wall
installation & curing setup.

12/24/17 ~ Vollmer 3776 Kurhaus - Sanatorium: Provisional placement.
12/25/17 ~ Cararama Hongwell Toys Volvo EC210 Hydraulic Excavator.

12/25/17 ~ Atlas Model Railroad Hairpin Fence. /// SceneMasters City
Travelers.

12/27/17 ~ 4671 Crane car ~ DB: Trim crank handle.

01/05/18 ~ Sanatorium (Kurhaus), Vollmer: complete.

Euro T&F 007 ~ 01/07/18 ~ Interior lighting: Vollmer 3776 Kurhaus -
Sanatorium. /// 01/08/18 ~ CB025: Install onto Plank 01.

Euro T&F 007 ~ 01/08/18 ~ Interior lighting: Vollmer 3776 Kurhaus -
Sanatorium installed on Levelground.

01/09/18 ~ Faller's Ferris Wheel: unpack.

01/09/18 ~ Faller's Ferris Wheel: unpack sprues.

01/09/18 ~ Faller's Ferris Wheel: unpack sprues.

01/10/18 ~ Train Layout: Rear Bumpers prevent the window sill from
crashing into Sanatorium (Kurhaus), Vollmer.

01/19/18 ~ Faller's Ferris Wheel: wheel halves. /// 01/20/18 ~ Faller's
Ferris Wheel: wheel center.

01/23/18 ~ Faller's Ferris Wheel: First wheel halve installed on the
spokes.
01/24/18 ~ Faller's Ferris Wheel: Second wheel halve installed on the
spokes.

01/24/18 ~ Faller's Ferris Wheel: Four Supports. /// Faller's Ferris
Wheel: Floor.

01/24/18 ~ Faller's Ferris Wheel: Floor & Wheel Support.
01/25/18 ~ Faller's Ferris Wheel placed into Ferris Wheel Supports.

01/25/18 ~ Faller's Ferris Wheel: Installing ladders with some Jim Beam
assistance.

01/25/18 ~ Faller's Ferris Wheel with Hub Décor. /// Faller's Ferris
Wheel Platform with Guard Rails and Motor Shed.

01/26/18 ~ Faller's Ferris Wheel: Booth, missing part of Front Wall. ///
Faller's Ferris Wheel Platform only pending Gondolas.

02/05/18 ~ Faller's Ferris Wheel complete: by Night: all lights are ON.
02/09/18 ~ Clothes pin hack to make a mini-clamp.

Euro T&F 007 ~ 02/10/18 ~ Kibri 9760 Roman style church in
Jakobwullesheim. Box ~ Sprue 01 ~ Sprue 02 ~ Sprue 03&04.

Euro T&F 007 ~ 02/10/18 ~ Kibri 9760 Roman style church in
Jakobwullesheim. Sprue 05&06 ~ Sprue 07&08 ~ Sprue 09&10 ~ Sprue 11&12.

Euro T&F 007 ~ 02/10/18 ~ Kibri 9760 Roman style church in
Jakobwullesheim. Sprue 13&14 ~ Sprue 15&16 ~ Sprue 17&18 ~ Sprue 19&20.

Euro T&F 007 ~ 02/11/18 ~ Jakobwullesheim: Front Wall & Black-out paper.

Euro T&F 007 ~ 02/11/18 ~ Small & large papercutters. /// 02/12/18 ~
Church Floor ~> Drill access holes using a stepless drillbit.

02/13/18 ~ Jakobwullesheim Church ~> Inner building complete. ///
02/15/18 ~ Heat Sink 001: permanent placement of R1025ab & BS048ab.

02/18/18 ~ CB026 installed onto Vlak XX 05. /// 02/18/18 ~ Faller's
Ferris Wheel installed onto Vlak XX 05.
02/19/18 ~ Faller's Ferris Wheel wire connections under floor. ///
02/19/18 ~ Faller's Ferris Wheel test operation with Xfmr 018.

02/19/18 ~ Plank 13: drill wire feed-through hole using vintage manual
drill. /// 02/19/18 ~ Install Heat Sink 001 inside Stud Ultrasteel 01.

02/23/18 & 02/25/18 ~ Jakobwullesheim Church ~> Front Side buildings in
process.

02/26/18 ~ Jakobwullesheim Church ~> Front Side & Towers in process, note
clothes pin mini-clamps.

02/28/18 ~ Jakobwullesheim Church ~> Towers in process: bottom (loose fit
roof).

03/03/18 ~ Jakobwullesheim Church ~> Tower Side Wall: needs to fit behind
stairs, one pin in the way.

03/05/18 ~ Jakobwullesheim Church ~> Towers: only need inner walls.

03/11/18 ~ Jakobwullesheim Church ~> Side walls: Black-out paper. ///
03/11/18 ~ Jakobwullesheim Church ~> Side walls.

03/11/18 ~ Jakobwullesheim Church ~> Side walls. /// 03/22/18 ~
Jakobwullesheim Church ~> Sanctuary walls.

03/22/18 ~ Jakobwullesheim Church ~> Sanctuary walls. /// 03/25/18 ~>
Sacristy walls. /// 03/28/18 ~> Roofs installed.

04/05/18 ~ Jakobwullesheim Church ~> Both Tower Walls.
04/06/18 ~> Assembling Tower Walls two by two & replace original clocks
with clocks enclosed.
04/06/18 ~> Assembling Tower Walls onto Bases. /// 04/06/18 ~> Temporary
placement of Towers.

04/13/18 ~ Jakobwullesheim Church ~> Install 2* Black-out paper to block
light from bottom of Towers.
04/13/18 ~ Jakobwullesheim Church ~> Complete.
To: Euro
T&F Links ~~~>
To: Euro T&F 006 ~~~>
This page is Euro T&F 007
To: Euro T&F 008 ~~~>